Electrical Overview
3000 Skyline’s advanced infrastructure provides the flexibility for data centers
to utilize the mechanical systems of their choice, and maximize their electrical densities.
Electrical Overview
- ERCOT managed grid feeds the on-site substation from redundant 138kV transmission lines
- The on-site substation has two (2) new 47MVA transformers providing 2N reliability
- Oncor commitment provides two additional 47MVA transformers for a future total of 4 transformers
- Oncor will provide roll-up transformer within 24 hours as part of the disaster recovery plan
- Redundant 20MVA A&B circuits delivered underground from on-site substation to each Quad
- 100% backstand power capacity
- Power is delivered at 12.5kV
- 2 dedicated 1,200 Amp Circuit Breakers per quad
- Quadrant tenants able to contract with the retail electric provider of choice
|
|